Projects

Recent projects

San Diego II

San Diego II

This Full renovation included a complete layout modification and a new master bedroom was added. Electrical rewire and foundation reinforcement as we added new posts and piers along with a brand new sub floor. All new construction windows..
La Mesa I

La Mesa I

Permitted interior and exterior Renovation along with a bonus room Conversion. This Renovation includes the addition of A bathroom, layout reconfiguration and relocation of the kitchen.The bonus room square footage was extended and a bathroom was added. The home is a complete Electrical rewire and the Electrical panel was upgraded. All new windows and new Roof- Shingles.
Oceanside III

Oceanside III

We completed a 1200 Sq Ft ADU on the rear of an existing home. Efficiency and strategy was crucial to complete this project as there were tenants in the main home during the whole project timeline. The project consists of 2 bedrooms, 2 bathrooms, kitchen, dining and living room with low maintenance landscape.
Vista I

Vista I

Converted existing garage into a 1 bedroom 1 bathroom fully permitted 650sf garage conversion with a full kitchen and washer dryer.
National City II

National City II

Turned a single family residence into a Triplex by converting an Existing two car garage into a 427sf, 1 bed 1 bath Jadu. We also converted a previous family room into a 392sf Studio. This project was capitalized under 10 weeks.
National City I

National City I

Executed a complete layout change of a commercial store by re-framing interior walls and added 3 office spaces, a conference room, break room with utilities and a full bathroom. This was a permitted complete interior and exterior renovation.
El Cajon I

El Cajon I

Completed a 6 week renovation with layout changes to the interior by adding a full master bedroom and bathroom along with a library. The complete home is a 2 story 4 bedroom 3 bathroom ranch style project.
Palm Springs I

Palm Springs I

Completely modified the layout of the home and added a full master bedroom/bathroom along with an additional bedroom. Water/sewer and electrical is brand new on this 4 bedroom 3 bathroom home.
San Diego I

San Diego I

Fully renovated the interior and exterior of this 2 story 4 bedroom 3 bathroom home and Re structured the bottom floor for an open concept look. This required to collaborate with an engineer for proper structural calculations.
Oceanside II

Oceanside II

Fully renovated 1 story 3 bedroom 2 bathroom home with an incredibly view. This project required foundation reinforcement and a brand new roof. Completely new kitchen layout along with a large 10 foot bu fold door overlooking the yard out of the dining room.
Oceanside I

Oceanside I

Full home renovation and the addition of 500 Sf for master bedroom/ bathroom. We extended the kitchen to the back. Also, installed new insulation and drywall.
Escondido I

Escondido I

Full home renovation. We installed new flooring and renewed the kitchen and master bathroom.

Our Core Values

Inclusivity and Respect

Cultivate an inclusive culture where every team member is valued, fostering open dialogue, diverse perspectives, and collaborative decision-making.

Integrity

Build a culture of integrity and respect with vendors and crews. Fair and timely payment, recognition of contributions, and trusted relationships are our priorities.

transparency

Ensure transparent client relationships with clear budget breakdowns. Walk projects together, provide progress updates and pictures for billing transparency.

Continuous improvement

Embrace continuous improvement and learning. Encourage professional growth, skill development, and stay updated to deliver innovative solutions and exceptional service.

Get a free quote

Free consultation