Spearhead Construction

Empowering dreams, building futures

Excelling in construction with high quality workmanship, transparent budgets, open communication, and a team that treats your project like their own.

Licensed & insured
CSLB #1099643
Projects delivered
110 and counting
Where we build
All of San Diego County

What we build

Nine ways to build on what you own

Drawn the same way, one after another, so you can tell them apart.

  1. Garage conversion

    The garage becomes the unit. Walls, roof and slab are already standing, so it is usually the cheapest way in. What you give up is the garage.

  2. Above the garage

    Built on top of the garage you already have. You keep the parking and build on ground that is already covered.

  3. Attached

    Shares a wall with your house but has its own entrance, kitchen and bath. Cheaper than detached: one wall and some utilities are already there.

  4. Studio

    One open room with a kitchenette and a bathroom, with no separate bedroom. The smallest thing that still counts as its own home.

  5. Detached

    A separate small building in the yard. The most privacy, and the most expensive, because it needs its own foundation, roof and utility runs.

  6. Multifamily

    More than one unit in the same building, priced across the whole thing rather than per door.

  7. Home addition

    More square footage on the house you already have. Same roofline, same address, more room.

  8. Home remodel

    Working inside something already standing. You inherit its walls, and its surprises.

  9. Commercial remodel

    Interior and exterior build-outs for a business: offices, break rooms and the utility work behind them.

Why Spearhead

For your construction project needs

Open-plan living room delivered by Spearhead Construction in Oceanside, California
  1. 1

    Transparent Budgeting

    A line-item budget before we start, so nothing shows up halfway through.

  2. 2

    Open Communication

    One point of contact, and a walkthrough at every stage of the build.

  3. 3

    Expertise and Experience

    An experienced crew and the trades to match, whatever the project needs.

  4. 4

    Client-Centric Approach

    The plan fits your project and your schedule, not a template.

The risk you are worried about

Do you have a construction project but worry about the wrong contractor?

  • Licensed and insured, CSLB #1099643
  • A line-item budget before work starts
  • 110 projects delivered across San Diego County
Schedule a consultation

Recent work

Projects we have delivered

Oceanside III: Accessory Dwelling Units in Oceanside, California

Accessory Dwelling Units

Oceanside III

Oceanside, California

We completed a 1200 Sq Ft ADU on the rear of an existing home.

  • 1,200 sq ft
  • 2 bed
  • 2 bath
View this project
El Cajon I: Full Home Renovation in El Cajon, California

Full Home Renovation

El Cajon I

El Cajon, California

Completed a 6 week renovation with layout changes to the interior by adding a full master bedroom and bathroom along with a library.

  • 4 bed
  • 3 bath
  • 8 photos
View this project
National City I: Commercial Remodel in National City, California

Commercial Remodel

National City I

National City, California

Executed a complete layout change of a commercial store by re-framing interior walls and added 3 office spaces, a conference room, break room with utilities and a full.

  • 7 photos
View this project

Reviews

What our clients say

From my personal experience as a design and permitting services partner, Spearhead Construction is a company that genuinely epitomizes their mission and vision of exceeding client expectations and maintaining superior quality in all aspects. Their ability to infuse their values into every project, irrespective of scale, resonates with their meticulous attention to detail, professionalism, and dedication. They go beyond constructing mere structures to building long-lasting relationships, with an emphasis on effective communication, integrity, and mutual respect. These qualities make collaborations with them not only productive but also remarkably pleasant and stress-free. So, as someone who works closely with them, I can confidently vouch for their unwavering commitment to their mission and vision. With Spearhead Construction, you’re not merely selecting a construction company; you’re choosing a partner that values and elevates your project as much as you do.

Winston

I had the pleasure of working with Spearhead Construction on my personal home in Clairemont. They were extremely professional, very understanding of my needs. The work they did was high quality and I am so happy with the end result. There are always horror stories of working with Contractors, Spearhead does not fit that stereotype. I am very happy with them and their communication level.

David Hussein

Working with George, Leo, and Marco and the whole Spearhead team has been a breath of fresh air in the construction industry. They are the opposite of over promise and under deliver and take extreme pride in their work. They can take on larger projects and their internal systems allow for a highly efficient result. They were able to get my ADU complete 5 weeks before the deadline. The norm in this industry seems to be excuses and delays so having a project finish on time and on budget is a real asset to my business. A++ for Spearhead!

CJ Johnson Lifehouse SD

I love working with Spearhead Construction! Their knowledge, passion, and communication is excellent and they exceed expectations on a daily basis!

Melanie Harder

Before you call

Questions we get every week

The things owners ask on the first call, answered the way we would answer them on the phone.

What exactly counts as an ADU?

An Accessory Dwelling Unit is a second, self-contained home on a lot that already has a house. Self-contained is the operative word: it needs its own kitchen, bathroom, sleeping area and entrance.

There are four common shapes: a detached unit in the backyard, a unit attached to the existing house, a converted garage, and a Junior ADU carved out of the house itself. Which ones your lot allows depends on its size, its setbacks and the local rules where you live.

How long does an ADU take from first call to move-in?

Two clocks run, and they are very different.

Construction has a schedule you can plan around. Once the permit is issued and the crew is on site, the sequence is predictable and we can tell you the week each stage lands.

Permitting is the one that surprises people. The submittal goes to plan check, comes back with corrections, and how many rounds that takes depends on how complete the plan set was going in. It is the single biggest lever on your timeline, and it happens before a shovel touches the ground.

We give you both numbers separately at the quote, so you are not planning around one figure that hides the other.

What actually drives the cost of an ADU?

Square footage is what everyone asks about first, and it is rarely what moves the number the most. The bigger drivers are:

  • How far the utilities have to travel. A unit at the back of a deep lot needs longer sewer, water and electrical runs, and sometimes a panel upgrade.
  • Site access. If a truck cannot reach the build area, material gets moved by hand and labour hours climb.
  • Foundation and grade. A flat, stable pad is cheap. A slope is not.
  • Finish level. The same footprint can swing widely depending on what goes inside it.

A garage conversion usually starts lower than a detached build because the slab, the walls and the roof already exist and are already permitted as structure.

Can I rent the ADU out?

In most cases yes, and for many owners the rent is the reason the project pencils out. What varies is the type of rental allowed: long-term versus short-term rules are not the same thing and are not decided at the same level of government.

Before you design around a rental plan, it is worth confirming what your specific address allows. We flag it during the feasibility stage rather than after the plans are drawn, because it can change the layout you want.

Do I have to add a parking space?

Not always, and the exceptions are broader than most owners expect: proximity to transit and the type of unit both matter.

This is one of the first things we check, because parking requirements can eat the same backyard area you wanted to build on. Finding out early is the difference between designing once and designing twice.

Do I have to deal with the city, or do you?

We do. Design coordination, the plan set, the submittal, the corrections cycle and the inspections all run through us, and you get told where it stands without having to ask.

You are the owner, so anything that needs your signature comes to you, but chasing plan check is our job, not yours.

Can we keep living in the house during construction?

For a detached ADU, almost always. The work happens away from the house and the disruption is mostly noise, dust and trucks during working hours.

For an attached unit or a full renovation it depends on what gets touched and for how long, especially if the kitchen, a bathroom or the main panel is out of service. We walk through that with you before the schedule is locked, so nobody discovers it mid-project.

What do you need from me to give a real number?

The property address and a rough idea of what you want. That is enough for a first conversation.

To move from an estimate to a number you can plan around, it helps to have any existing plans of the house, the age of the electrical panel, and whether you have had any survey or soils work done. If you do not have those, we find out. It just takes a visit.

See what fits on your lot

Remodel your home with a team that holds high standards. Committed to the pursuit of excellence.

See what's possible

Cookie settings

Choose which cookies we may use. You can change this at any time from the link in the footer.